已知当工资率从每小时5元增加到每小时8元时,某企业工人每天愿意工作的时间从8小时增加到9小时,假
A.增加3小时
B.减少3小时
C.增加2小时
D.减少2小时
C
A.增加3小时
B.减少3小时
C.增加2小时
D.减少2小时
C
A.从100%下降至50%
B.从100%上升至200%
C.从100%上升至300%
D.从lOO%上升至400%
假设工资率是16美元/小时,产品价格是2美元。每小时产出和劳动投入的关系如下:
(1)找到利润最大化时的劳动数量。
(2)假设产品价格保持2美元不变,但工资率上升到21美元。找到新的利润最大化的劳动数量。
(3)假设产品价格增加到3美元而工资保持在16美元。找到新的利润最大化的劳动数量。
(4)假设产品价格2美元和工资率16美元保持不变,但是技术进步导致任何劳动投入水平下的产出都增加25%。找到新的利润最大化的劳动数量。
Suppose that the wage rate is $ 16 per hour and the price of the products $ 2. Values for output and labor are in units per hour.
a. Find the profit - maximizing quantity of labor.
b. Suppose that the price of the product remains at S2 but that the wage rate increases to $21. Find the new profit - maximizing level of 1
c. Suppose that the price of the product increases to $3 and the wage remains at S 16 per hour. Find the new profit - maximizing L.
d. Suppose that the price of the product remains at $2 and the wage at $ 16, but that there is a technological breakthrough that increases output by 25 percent for any given level of labor. Find the new profit - maximizing L
A.缺乏弹性
B.富有弹性
C.单位弹性
D.无弹性
A.与工会重新谈判更高的工资要求
B.由于从国外购买材料,原材料成本大幅下降
C.劳动生产率的显著变化
D.固定成本中的制造费用大幅度削减
有人愿意向大华公司订购一批产品,出价30000元。大华公司估计,如承接这一生产任务,将发生以下成本:
人工:需A级工人2000小时,每小时4元,但目前这种工人的任务已经饱满。另需B级工人1000小时,每小时3元,这种工人目前正闲着,但工资是照付的。
变动间接费用:按A级工工时每小时2元计算。
固定间接费用:按A级工工时每小时3元计算。另外,需增加一台专用设备,使固定成本增加3000元。
材料:需用材料C1000单位,这批材料的价款,根据协议将于下月支付,价格议定为4元/单位(假定这个协定价格与现在的市价相符)。另需用材料D1000单位。这批材料是以前购进的,它现在的账面价格为2元/单位,现在的变卖价值为1元/单位。但材料D也可用来替代材料E生产其他产品(1个单位D可替代1个单位E),材料E目前市场价格为3元/单位。
由于A级工人的供应数量有限,如果公司接受这笔订货,它必须从从事其他任务的A级工人中抽调。A级工人在其他任务中,每小时能为公司提供5元贡献。
问:大华公司应否承接这笔订货?
表8-10 生产数据
|
假设工资率是16美元/小时,产品价格是2美元。每小时产出和劳动投入的关系如下:
q | L |
0 | 0 |
20 | 1 |
35 | 2 |
47 | 3 |
57 | 4 |
65 | 5 |
70 | 6 |